Bengaluru :”The government’s goal is to provide a permanent solution to Bengaluru’s problems. The government has given special priority to the city’s development, and significant infrastructure projects have been undertaken over the last three years. Never before in Bengaluru’s history has such a massive amount of money been invested in development,” said Chief Minister D.K. Shivakumar.
He was speaking on Tuesday after laying the foundation stone at Gunjur in the Mahadevapura Assembly constituency for drain and flood control works being developed under the World Bank-assisted Karnataka Water Security and Disaster Resilience Programme.
“The government has taken note of the hardships faced by people due to waterlogging in several areas during rains. To provide a permanent solution to monsoon-related issues, development works for rajakaluves (stormwater drains) and rainwater drains have been taken up at a cost of around ₹2,000 crore. Necessary measures, including the construction of retaining walls and clearance of encroachments, are being undertaken in several other areas,” he said.
“A foundation stone ceremony is not merely an event to lay a stone. It is a programme to respond to people’s dreams, provide permanent solutions to their problems, and bring about a positive change in their lives,” he stated.
No Politics Played in Bengaluru’s Development
“Several major works were carried out in Bengaluru under the JNNURM scheme implemented during former Prime Minister Manmohan Singh’s tenure. Development works, including the Hoskote Road, K.R. Puram stretch, Airport Flyover, Electronic City Flyover, and Nelamangala Flyover, were not executed with political motives; they were undertaken with the city’s development in mind,” he said.
“Bengaluru is globally recognised today, and lakhs of people from across the country and abroad are moving to the city in search of employment. In line with the city’s growth, there is a need to expand basic infrastructure such as roads, drinking water, and underground drainage,” he added.
New Grid System for Bengaluru Road Development
“A road grid system is being designed in Bengaluru to rectify the urban planning lapses that occurred during previous governments. In the coming days, strict measures will be taken to prevent unregulated building construction within the limits of these road grids,” he said.
“Regarding the road connecting Hoskote to Nandagudi, the previous BJP government, during the final leg of its tenure, had issued a notification for the construction of a 100-metre-wide road. This would have resulted in the demolition of around 5,000 to 6,000 buildings. To avoid causing hardship to the public, we identified an alternative route and made a new decision to develop a 45-metre-wide road wherever necessary. This has saved thousands of buildings while sparing the government a massive compensation burden,” he explained.
“A comprehensive map is being prepared and reviewed to identify remaining stormwater drain encroachments and locations requiring retaining walls across various parts of Bengaluru. The government has also prioritised projects such as flyovers, double-decker roads, and Metro expansion,” he noted.
“Traffic congestion has increased for employees in areas with a high concentration of IT-BT industries. Since they contribute significantly to tax revenues, thousands of crores of rupees in grants have been allocated for the development of these areas. It is not possible to fix all of Bengaluru at once, nor is widening roads by demolishing buildings the solution. Projects must be designed in a way that causes minimal inconvenience to the public,” he said.
Obstructing the Tunnel Project is Not a Healthy Trend
“The government is striving to take up the tunnel road project to ease traffic congestion in Bengaluru. However, opposition is coming from individuals who lack experience, and cases have been filed in court. The tendency to unnecessarily obstruct development projects is not right. Everyone must cooperate for the city’s development,” he urged.
Action Against Land Mafia
“A large number of people from other states and districts are settling in Bengaluru, including in Mahadevapura. We need to pursue inclusive development, but we must not give room to the land mafia. Cases of harassment against original landowners have come to my notice, and police officers must maintain strict vigilance in such matters. Allegations regarding the involvement of politicians and police officers with the land mafia will have to be investigated,” he warned.
Illegal Addition of Voters in Certain Constituencies
“Around 45 lakh votes were reduced in Bengaluru during the Special Intensive Revision (SIR) process. A serious review is needed regarding the addition and deletion of names in the electoral rolls. Media reports have highlighted that 12,000 to 15,000 new votes were illegally added in certain constituencies without original documents. There should be no ineligible inclusions in the voter list, nor should the names of eligible voters be dropped. Everyone must safeguard their right to vote—it is not just a voting right, it is a right to self-respect. Party workers must go door-to-door to verify the voter list,” he said.
“Along with the state government’s five guarantee schemes, a ‘Bhoomi Guarantee’ (land guarantee) has also been provided to the people. A survey revealed discrepancies in the bank accounts and other details of beneficiaries under certain schemes, including Gruha Lakshmi. We will collect information door-to-door and resolve these issues so that benefits reach all eligible beneficiaries. Youth power must be awakened through Bharat Jodo Youth Associations,” he added.
Public Cooperation Essential for Development Works
“Politics comes and goes, but development works remain permanent. I am confident that people respect those who work for them. Everyone shares the responsibility of upholding the dignity and development of Bengaluru. I appeal to everyone to ensure government schemes reach the people and to cooperate in their implementation,” he requested.
Media Interaction
Responding to the media at Gunjur in Mahadevapura, when asked whether Bengaluru had received higher grants over the last three years, the Chief Minister said, “I am answering with statistical records. Have the BJP built any major flyovers? When asked to suggest an alternative to the tunnel project, they have no answer. If we propose a flyover, they complain that trees will be cut. Then where are people supposed to commute?”
Works Worth ₹20,000 Crore Underway in Bengaluru
“Our government has given priority to the city’s road and infrastructure development. Various development works worth nearly ₹20,000 crore, including the construction of new roads, are currently in progress in Bengaluru. Alongside developing stormwater drains to prevent monsoon flooding, steps are also being taken to ease traffic congestion,” he said.
Target to Build a 500-km Metro Network
Responding to a question on Metro development, he said, “Keeping Bengaluru’s future transit needs in mind, we aim to expand the Metro network. The objective is to build a total Metro network of 500 km in the city. Proposals for about 300 km of routes are already at various stages of approval. Plans for the remaining stretches will be formulated and implemented in phases.”
Leave a Reply
Leave a Reply
Posted in: Regional News, Latest News, News, top-featured









